| 1. |
. |
ASSE A10.19 |
|
|
2008-JAN-01 现用
Safety Requirements for Pile Installation and Extraction Operations American National Standard for Construction and Demolition Operations
|
|
| 2. |
. |
PIP STS02465 |
|
|
2005-MAR-01 现用
Augered Cast-in-Place Pile Installation Specification
|
|
| 3. |
. |
API REPORT 80-29 |
|
|
1981-MAR-01 现用
Review and Compilation of File Test Results Axial File Capacity
|
|
| 4. |
. |
ARMY ARMY TI 818-03 |
|
|
1998-AUG-03 不活跃/已修订
PILE DRIVING EQUIPMENT
|
|
| 5. |
. |
DS DS/EN 996 + A3 |
|
|
2009-APR-03 现用
Piling equipment - Safety requirements
|
|
| 6. |
. |
UFC UFC 3-220-02 |
|
|
2004-JAN-16 现用
PILE DRIVING EQUIPMENT
|
|
| 7. |
. |
ACI 543R |
|
|
2000-JAN-01 现用
Design, Manufacture, and Installation of Concrete Piles
|
|
| 8. |
. |
AFNOR NF EN 62282-3-3 |
|
|
2008-APR-01 现用
Fuel cell technologies - Part 3-3 : stationary fuel cell power systems - Installation
|
|
| 9. |
. |
ASCE 20-96 |
|
|
1996-JAN-01 不活跃
Standard Guidelines for the Design and Installation of Pile Foundations
|
|
| 10. |
. |
BSI PD IEC 61955 |
|
|
2000-DEC-15 现用
Primary Batteries - Summary of Research and Actions Limiting Risks to Reversed Installation of Primary Batteries-IEC 61955: 1998;
|
|